Construction Systems

  • Location: Munich, Germany
  • Architects: Koch und Partner, Munich
  • Completion: 2002
  • Client: Terminal 2 Immobilien-Verwaltungsgesellschaft mbH Flughafen München, Baugesellschaft mbH, München
  • Scope of Work: Steel Substructure and  Double Glazed Façade
  • Cladding: approx. 12.000 sqm double façade with 23.100 sqm tempered safety glass, laminated glass and insulated glass
  • Type of Stucture: Post mullion structure

1 flughafen_muenchneAfter a construction time of more than two years, the second terminal of Munich Airport was completed. and opened in spring 2003.
Terminal 2  will double the passenger capacity of Munich Airport to 25 million per year.

The double glazed façade constructed by MERO as a structure of ladders with connecting trusses has a total surface of approx. 12.000 sqm. The rectangular hollow sections of the façade substructure carry the glass panels and sealing profiles.

 

 2 flughafen muenchen

 

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.

https://www.youtube.com/channel/UCPvekf1CiPH7Jeg5VhnVfEw