Floor Systems

  • Client: DFS - Deutsche Flugsicherung GmbH
  • General planning and construction supervision: Henn GmbH, Munich
  • Planning of building services equipment: GFI Gesellschaft für Ingenieurplanung Munich
  • Floor systems: 5,000 m² access floor Type 6 NB38/R; Type 2 - 600/N36; 
    Hollow Floor Combi A 35 GFV-4 F30; Floor coverings
    2,000 m² SL modules for air ventilation floor
    1,000 m² woven carpet and rubber flooring
  • Completion: October 2013

A high-tech building where MERO-TSK has installed up to 1,10 m high floor systems with a high loadbearing capacity.

  • The flight controller/air surveillance area was equipped with an access floor of perforated mineral fibre panels.
    Air-conditioning is provided by way of carpet tile modules with a displacement ventilation system, which creates an optimal indoor cli-mate for 100 – 150 persons working in shifts 24 hours a day.
  • The utility rooms were provided with floor constructions for switchgear stations.
  • In the office areas, we installed our hollow floor type Combi A with a basis layer of anhydrite floor screed.

Flugsicherung Fhf München 2-kl Flugsicherung Fhf München 1 b kl Flugsicherung Fhf München 3

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies).

You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.

https://www.youtube.com/channel/UCPvekf1CiPH7Jeg5VhnVfEw