Floor Systems

  • Client: DFS - Deutsche Flugsicherung GmbH
  • General planning and construction supervision: Henn GmbH, Munich
  • Planning of building services equipment: GFI Gesellschaft für Ingenieurplanung Munich
  • Floor systems: 5,000 m² access floor Type 6 NB38/R; Type 2 - 600/N36; 
    Hollow Floor Combi A 35 GFV-4 F30; Floor coverings
    2,000 m² SL modules for air ventilation floor
    1,000 m² woven carpet and rubber flooring
  • Completion: October 2013

A high-tech building where MERO-TSK has installed up to 1,10 m high floor systems with a high loadbearing capacity.

  • The flight controller/air surveillance area was equipped with an access floor of perforated mineral fibre panels.
    Air-conditioning is provided by way of carpet tile modules with a displacement ventilation system, which creates an optimal indoor cli-mate for 100 – 150 persons working in shifts 24 hours a day.
  • The utility rooms were provided with floor constructions for switchgear stations.
  • In the office areas, we installed our hollow floor type Combi A with a basis layer of anhydrite floor screed.

Flugsicherung Fhf München 2-kl Flugsicherung Fhf München 1 b kl Flugsicherung Fhf München 3

Cookies make it easier for us to provide you with our services. With the usage of our services you permit us to use cookies.
https://www.youtube.com/channel/UCPvekf1CiPH7Jeg5VhnVfEw