Endress + Hauser New construction B 23 Maulburg
Client:
Endress + Hauser SE + Co. KG
Maulburg
Architects:
Duttlinger Architekten GmbH
Rottenburg
Construction Management:
Duttlinger Architekten GmbH
Rottenburg, H. Duttlinger
Floor systems:
Type 6 NB36 with factory applied Linoleum covering DLW Marmorette LPX 2,5 mm
Execution:
2020
Entrance area
In Maulburg, the company Endress + Hauser has built a measuring section for radar level measurements that is unique in the world and more than 60 m long. In order to exclude the influence of temperature fluctuations on the measurements, the building was constructed as a white tank in the groundwater. For control purposes and in order to be able to carry out any necessary grouting work, the approx. 1600 m² floor area was equipped with a MERO type 6 NB36 raised access floor with applied linoleum covering.
A panel heating/cooling system installed in the cavity of the raised floor compensates for minor temperature fluctuations.